Temporary Facility T-2728 FA8219-18-R-0010 (2024)

Posted: April 10, 2018, 7:25 p.m. EDT

Amended 10 April 2018 The purpose of this Amendment is to: 1. Revise the List of Documents, Exhibits or Attachments as follows: a) Attachment 1, Statement of Work Para. 2. updated to reflect supersession of Attachment 1A Workspace Specifications over Attachment 1D telecommunications installation criteria FROM: Attachment 1D Telecommunications Installation Criteria for Facility Design and Renovation TO: Attachment 1D Telecommunications Installation Criteria for Facility Design and Renovation, where not superseded by Attachment 1A Workspace Specifications b) Attachment 1A, Workspace Specifications for Temporary Facility is updated to reflect accurate requirements c) Attachment 3, FAR Clause 52.212-1 Addendum d) Attachment 4, FAR Clause 52.212-2 Addendum 2. Extend the proposal due date: FROM: 12 April 2018 at 2:00 p.m. Mountain Daylight Time. TO: 17 April 2018 at 2:00 p.m. Mountain Daylight Time. All other terms and conditions remain unchanged. ------------------------------------------------------------------------------------------------- Amended 27 March 2018
The purpose of this Amendment is to: 1. Revise the List of Documents, Exhibits or Attachments as follows: a) Attachment 4, FAR Clause 52.212-2 Addendum: 2. a. Evaluation Factors and Subfactors Factor 1: Technical is updated to reflect design proposal requirements: FROM: Subfactor 1: 60% Design Proposal TO: Subfactor 1: Design Proposal 2. Incorporate Vendor Questions, Comments, and Answers as part of the Federal Business Opportunities (FBO) notice. -------------------------------------------------------------------------------------------------
Amended 23 March 2018

The purpose of this Amendment is to:

1. Revise the List of Documents, Exhibits or Attachments as follows:

a) Attachment 1, Statement of Work:

Para. 1. Updated to reflect facility area and parking lot lighting.
Para. 2. Attachment 1E - Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities (IC tech spec for ICD/ICS 705) is updated.
Para. 2. Attachment 1L - Site Map is updated.
Para. 3.1.5.6. Updated to reflect facility area and parking lot lighting.
Para. 3.2.2. Updated to reflect CDRL reference.
Para. 3.2.6. Updated to reflect Americans Disability Act requirements.
Para. 3.2.8. Updated to reflect OSHA Standards.
Para. 3.2.18.1. Updated to reflect CDRL reference.
Para. 3.2.18.2. Updated to reflect facility area and parking lot lighting.
Para. 3.2.18.7. Incorporated to reflect connection requirements.
Para. 3.2.21.3. Updated to reflect accident safety mishap reporting and CDRL reference.

b) Attachment 1A, Workspace Specifications for Temporary Facility is updated to reflect accurate bathroom requirements, cells A-G36 and 37, 20 and independent work spaces, cells A-G 181 are updated to reflect six foot (6') work desks.

c) Attachment 1E, Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities (IC tech spec for ICD/ICS 705), is updated to Version 1.4 dated 28 September 2017.

d) Attachment 1L, Site Map, is updated to reflect additional information.

e) Attachment 3, FAR Clause 52.212-1 Addendum:

Paragraph 5.3.3. is updated to reflect a proposal guarantee (bid bond) in the amount of 20%.

2. Extend the proposal due date:

FROM: 29 March 2018 at 2:00 p.m. Mountain Standard Time

TO: 12 April 2018 at 2:00 p.m. Mountain Daylight Time.

-------------------------------------------------------------------------------------------------
Amended 14 March 2018
The purpose of this Amendment is to:

1. Revise or add to the List of Documents, Exhibits or Attachments as follows:

a) Attachment 1, Statement of Work:

Para 1. Updated to reflect a single story requirement
Para 2. Add Attachment 1N - AFNWC Comm Req (SCOIW)
Deleted 3.1.5.5.1. in its entirety.
Deleted 3.2.17. in its entirety.
Deleted 3.2.17.1. in its entirety.
Deleted 3.2.20.2. in its entirety.
Revised the table at 3.2.28.

b) Attachment 1A, Workspace Specifications for Temporary Facility double-door Intelligence Community Directive (ICD)705/Intelligence Community Standard (ICS) 705-1 construction procedures are deleted from cell G10.

c) Attachment 1F, Air Force Furnishings Commodity Council Contract Requirements is revised with current Utah vendor points of contact.

d) Attachment 1N, Communication Requirements, is incorporated.

e) Attachment 3, FAR Clause 52.212-1 Addendum, Paragraph 3.2 is updated to reflect UFC requirements, UFGS format, and design stamps. Paragraphs 3.3 and 3.4 are updated to reflect a single story requirement. Paragraph 5.3.3. is updated to further outline proposal guarantee (bid bond) requirements.

f) Attachment 4, FAR Clause 52.212-2 Addendum, Subfactor 1 is updated to reflect UFC requirements, UFGS format, and design stamps. Subfactors 2 and 3 are updated to reflect a single story requirement

g) Attachment 8, CDRLs A001, A002, and A003 are renumbered A028, A112, and A071 respectively.

2. Delete FAR Provision 52.232-13 Notice of Progress Payments from the solicitation.

3. Add DFARS Clause 252.232-7007 Limitation of Government's Obligation

----------------------------------------------------------------------------------------------
28 February 2018
This Request for Proposal (RFP) defines the requirements to procure a pre-fabricated temporary office facility, not to exceed 24,530 square feet, for 204 personnel; perform all required site preparation (earthwork, foundations, exterior utilities, sidewalks, area lighting, parking lots, access roads, etc.); to assemble and install the portable facilities at Hill Air Force Base, Utah; procure and install all system furniture, chairs and cubicles.
***A pre-proposal conference will be conducted at Site location of proposed temporary pre-fabricated facility T-2728 on Tuesday, 13 March 2018 at 09:00 a.m. Mountain Standard Time for the purpose of answering questions regarding this solicitation in accordance with Air Force Federal Acquisition Regulation Supplement (AFFARS) 5352.215-9001

What: Pre-proposal conference
When: 13 March 2018 at 09:00 a.m. Mountain Standard Time
Where: Building 1580 north parking lot
6008 Wardleigh Road
Hill Air Force Base, Utah
84056

Please confirm attendance (RSVP) no-later-than 02:00 p.m. Mountain Standard Time on 09 March to Brogan Fullmer.

What: RSVP (R pondez s'il vous pla t)
When: 09 March 2018 at 02:00 p.m. Mountain Standard Time
To: Brogan Fullmer, Brogan.Fullmer@US.AF.Mil
Provide: Visitor's first and last name, driver's license number, state of driver's license issue***

****To obtain visitor pass, please visit the Hill Air Force Base South Gate Visitors Center

Where: Building 542, Bernard Fisher Highway (State Road 193, 700 S) S Gate Avenue****

*****To reach the South Gate Visitors Center from Interstate-15:

Take I-15 the Clearfield exit at 700 S
- Turn right onto Bernard Fisher Highway (State Road 193, 700 S)
- Turn left onto Hill Field Road
- The Visitors Center is on the right (east side) of the road*****

Temporary Facility T-2728 FA8219-18-R-0010 (2024)
Top Articles
Latest Posts
Article information

Author: Francesca Jacobs Ret

Last Updated:

Views: 6361

Rating: 4.8 / 5 (48 voted)

Reviews: 87% of readers found this page helpful

Author information

Name: Francesca Jacobs Ret

Birthday: 1996-12-09

Address: Apt. 141 1406 Mitch Summit, New Teganshire, UT 82655-0699

Phone: +2296092334654

Job: Technology Architect

Hobby: Snowboarding, Scouting, Foreign language learning, Dowsing, Baton twirling, Sculpting, Cabaret

Introduction: My name is Francesca Jacobs Ret, I am a innocent, super, beautiful, charming, lucky, gentle, clever person who loves writing and wants to share my knowledge and understanding with you.